Project Type: Residential refurbishment/ Flat Fit Out

Contract Administrator: Tuffin Feraby Taylor LLP

Site Manager: Paul Kitcher

Client: Pembroke Grafton LP Limited

Location: Mayfair, London W1J

Project Duration: 10 weeks

 A High-Quality Residential Refurbishment in Mayfair, a residential unit situated off Berkeley Square, Central London. One of Mayfair’s most fashionable locations, in the heart of the City of Westminster.  The surrounding  area is of mixed-use commercial, office
and residential use.

The project was to undertake a high-quality refurbishment of an existing first floor flat.  The works included the high-quality refurbishment of the existing ground/1st-floor apartment, including Strip out, New Parquet Flooring, New Lighting throughout, Bespoke Joinery – Kitchen and Bedrooms, Spraying existing joinery, Decorations and Electrical installation.

 The project was challenging due to being design lead on a short programme and a high quality to be achieved for the client to rent out in the top sector. The challenges faced on this project were overcome through our proactive and professional approach, along with the skilled tradesmen and management employed.