We have recently completed our external refurbishment project at Thames Wharf Studios, London, W6. The roof replacement works and repairs to Blocks 4 and 5 are the largest single roof replacement project we have completed, with the exception of our project at the Royal Exchange Building.

We have been awarded this project following the successful completion of the refurbishment of the office floors and common part areas of Block 5 and 6 at Thames Wharf Studios in 2019.

Thames Wharf Studios are situated in the London borough of Hammersmith & Fulham, a prominent West London address. The building is located on the Hammersmith Embankment within the Fulham Reach Conservation Area and benefits from exceptional views over the River Thames. The area is full of buildings of architectural heritage including the Harrods Depository just across the river.

The works included roof replacement and repairs,

roof replacement and repairs London W6

new gutter linings

We have recently completed our external office refurbishment project at Thames Wharf Studios, London, W6 - the external maintenance and repairs to Blocks 4 and 5, roof replacement.

Installation of Mansafe fall protection systems, new rooflights, brickwork and carpentry repair.

roof replacement and repairs London W6

The external works at Thames Wharf Studios was an extremely difficult project due to the numerous logistical challenges. In spite of all the challenges, the project was managed exceptionally well and completed to a very high standard due to the hard work and dedication of our Site Manager Jonathan Fowler MCIOB and the professional approach and commitment of our suppliers and subcontractors.

Thames Wharf Studios External Works project has been awarded the Performance Beyond Compliance Considerate Constructors Scheme Certificate. The certificate confirms that the site performed beyond compliance in the five key sections of the scheme’s Code of Considerate Practice: care about appearance, respect the community, protect the environment, care about safety, and value the workforce.

The project has been completed over 16 weeks, we have been working alongside the Contract Administrator Tuffin Ferraby Taylor LLP.

For more information: https://godfreymartin.co.uk/project/thames-wharf-studios-external-works